gpt-5 and o3 shut down on 11 December: swap the model IDs, then test
Requests that name a gpt-5 family model, o3 or o3-pro stop working on 11 December 2026. The new models answer differently, so a swap needs a before/after check, not just a find-and-replace.
Cutoff: 2026-12-11 · 11 days left · Last verified 2026-11-21
What stops working, in plain English
- Hard-coded model IDs. Any request naming
gpt-5,gpt-5-mini,gpt-5-nano,gpt-5-pro,o3oro3-pro, or one of their dated snapshots, fails after the cutoff. - Fine-tuned models. Fine-tuned versions follow the same shutdown schedule as the base model they were trained from.
- Output changes. The replacements are different models. Prompts tuned for o3 or gpt-5 can give different length, tone or structure, which can break parsers and tests.
Exact dates and the vendor notice
| Date | What changes |
|---|---|
| 2026-12-11 | gpt-5, gpt-5-mini, gpt-5-nano, gpt-5-pro (and dated snapshots) |
| 2026-12-11 | o3, o3-pro (and dated snapshots) |
| 2026-07-23 | Already shut down: gpt-5-chat-latest, gpt-5-codex |
Source: OpenAI API deprecations page (vendor notice dated 2026-06-11). Last verified 2026-11-21. Vendors can change dates; we re-check weekly.
What the vendor says to use instead
| If you use | Move to |
|---|---|
gpt-5, o3 | gpt-6.1-sol |
gpt-5-mini | gpt-6.1-terra |
gpt-5-nano | gpt-6-luna |
gpt-5-pro, o3-pro | gpt-6.1-sol with reasoning.mode: pro in the Responses API |
Not covered here: gpt-5.1 and some later gpt-5.x models have their own, later date on the same page.
Usually a Small Sprint per codebase, Standard when several services or an eval set are involved.
Check your code locally, in two minutes
One small Python file. It only reads files in the folder you point it at, uses no network, runs nothing it finds and sends nothing anywhere. Read it before you run it.
- Download check-openai-2026-12-11.py (Python 3, standard library only).
- Run it on your project folder:
python3 check-openai-2026-12-11.py path/to/your-project - Each finding prints as
file:linewith the suggested replacement. Exit code 1 means it found something; 0 means nothing matched.
No Python? Use grep
Run this from your project folder (macOS, Linux or Git Bash). It is rougher than the script and can show extra lines, such as comments.
grep -rnIE --exclude-dir=node_modules --exclude-dir=.git --exclude-dir=.venv -e '(^|[^A-Za-z0-9._-])(gpt-5(-mini|-nano|-pro)?|o3(-pro)?)(-20[0-9]{2}-[0-9]{2}-[0-9]{2})?([^A-Za-z0-9._-]|$)|gpt-5-chat-latest|gpt-5-codex' .The check is a first look, not an audit: it can miss model names built at runtime (read from a database or glued together) and can flag text that is not a live call.
Audit, Sprint, Watch
Draft prices, final in your written scope. The audit sets the scope and your quote; no hourly billing. Draft pricing
Cutoff Audit
$500
We scan your repo for every affected call and give you the list of what breaks, when, the fix, and a written, scope-based quote for the Sprint. Credited in full to a Sprint bought within 30 days.
Migration Sprint: Small
$1,500
One cutoff, one codebase, up to about 25 call sites. Code change as a pull request, with a before/after test report.
Migration Sprint: Standard
$2,500-3,500
Several cutoffs or services, or a prompt/eval migration, with a check in your staging environment.
Migration Sprint: Complex
$4,000-5,000
Auth or protocol changes, or a data move such as leaving a hosted vector database.
Deadline Watch
$200-400 per month
Available only after a Sprint, billed by monthly invoice. No self-serve checkout.
A monthly scan against our deadline calendar, with alerts 60, 30 and 7 days before a cutoff that affects you.
How delivery works: We agree a written scope and date with you by email before work starts. Help is best effort: we tell you up front whether we can finish before your cutoff.
Every Sprint ships with a regression report (same inputs, old and new, differences explained). We work with read-only access and deliver changes as pull requests you merge.
To start, book a scoping call or email [email protected] with the platform and the cutoff. There is no form on this page. What happens to your email: privacy note.
Beat the 2026-12-11 cutoff.
Tell us the platform and the cutoff. We confirm what breaks and send a written, scope-based quote.